WORLD NEWS
Germany’s A1 near Dortmund faces a weekend closure from November 20
Germany’s motorway operator plans to close the A1 between Dortmund/Unna junction and Kamen-Zentrum for a weekend.
The closure runs from 8 pm on November 20 to 5 am on November 23, all in local German time.
Which section is closing, and why?
Crews will demolish the first half of the B1 bridge over the A1. Both directions close within this section; the announcement does not cover the entire A1. Drivers crossing western Germany should check whether their route passes through it.
Does traffic resume during the day?
The plan covers Friday evening through early Monday morning. It is a continuous weekend closure rather than a series of night closures. Check the operator’s latest notices before leaving, as the published timetable is a work schedule.

Diversions depend on your direction
For Bremen-bound long-distance traffic, the diversion starts at Westhofen junction and uses the A45 and A2. Cologne-bound traffic is directed onto the A43 from Münster-Süd. Local diversions will also be signposted; match the signs to your destination instead of relying only on a short navigation shortcut.
Will the B1 remain open?
During this A1 closure, the B1 remains open in both directions under its existing construction traffic layout. That exception does not mean every nearby road is always available. Check notices for your actual travel time, especially when other B1 sections or dates are involved.
How much extra time is needed?
The operator specifies diversions without guaranteeing a journey-time increase. WDR’s transport desk also advises a wide detour and extra time. Use the operator’s notice for the official boundaries and routes, and WDR for the wider roadworks context.
Primary sources and independent checks
Closure boundaries, local timetable and official diversions: Die Autobahn GmbH
WDR transport desk guidance and roadworks context: WDR