{"id":981,"date":"2026-07-30T05:41:00","date_gmt":"2026-07-29T20:41:00","guid":{"rendered":"https:\/\/onepress.co.kr\/index.php\/briefing\/2026-07-30-swift-rescue-link-spin-en\/"},"modified":"2026-07-30T05:41:00","modified_gmt":"2026-07-29T20:41:00","slug":"2026-07-30-swift-rescue-link-spin-en","status":"publish","type":"briefing","link":"https:\/\/onepress.co.kr\/index.php\/briefing\/2026-07-30-swift-rescue-link-spin-en\/","title":{"rendered":"The spacecraft sent to rescue a telescope is now spinning itself"},"content":{"rendered":"<p><strong>2026-07-30 05:41 KST<\/strong><\/p>\n<p>The robotic spacecraft sent to lift a falling NASA telescope has started tumbling during its own rescue mission.<\/p>\n<p>Two of LINK\u2019s three reaction wheels are not working, but power, communications, and main propulsion remain available, so the mission is not over.<\/p>\n<h2>What was LINK sent to save?<\/h2>\n<p>NASA\u2019s Swift observatory has detected gamma-ray bursts and other violent cosmic events since 2004. Increased solar activity expanded Earth\u2019s upper atmosphere, increasing drag and lowering Swift\u2019s orbit faster than expected.<\/p>\n<p>NASA awarded Katalyst $30 million in September 2025 to raise the telescope. LINK was designed, built, tested, and launched in less than a year, reaching orbit on July 3, 2026.<\/p>\n<h2>Why did the rescuer start spinning?<\/h2>\n<p>Katalyst said LINK spent roughly 72 hours in a multi-axis spin. Communications were temporarily lost and the spacecraft bus reset.<\/p>\n<p>Two of three reaction wheels, internal flywheels used to point a satellite, are non-functional. The small gas-thruster system used for fine control also has only partial functionality.<\/p>\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" src=\"https:\/\/onepress.co.kr\/wp-content\/uploads\/2026\/07\/swift-rescue-link-spin-en.png\" alt=\"Explanatory illustration of a spinning three-armed robotic spacecraft and a distant space telescope above Earth\" loading=\"lazy\" \/><figcaption class=\"op-briefing-image-caption\">ONEPRESS explanatory image: it visualizes LINK\u2019s attitude-control problem and the Swift rescue mission; it is not an actual orbital photograph.<\/figcaption><\/figure>\n<h2>The spacecraft is not dead<\/h2>\n<p>Electric propulsion, robotic systems, approach sensors, power, and communications are operating. LINK remains power positive and in contact with controllers.<\/p>\n<p>The team is using steerable electric thrusters to slow the spin. Its July 28 update said those burns had begun producing the intended effect.<\/p>\n<h2>Can it still reach Swift?<\/h2>\n<p>After stopping the spin, engineers must rewrite guidance and control software for the remaining hardware. Ground tests would be followed by a move into a similar orbit and an inspection of Swift.<\/p>\n<p>Capture will be attempted only if LINK is healthy and the approach is safe. Officials say the mission remains active, not that success is assured.<\/p>\n<h2>Why time matters<\/h2>\n<p>Swift suspended most science observations in February to reduce drag and preserve altitude. Every delay leaves less orbital margin for a capture attempt.<\/p>\n<p>This is the first planned commercial robotic capture of a government satellite never designed for servicing. It could open a new way to save aging spacecraft, but first the rescuer must stop spinning.<\/p>\n<h2>Official primary sources<\/h2>\n<p><a href=\"https:\/\/www.katalystspace.com\/mission\/link\" target=\"_blank\" rel=\"noopener noreferrer\">Primary source: Katalyst LINK mission tracker and July 28 status<\/a><\/p>\n<p><a href=\"https:\/\/science.nasa.gov\/blogs\/swift\/2026\/07\/28\/commissioning-update-for-spacecraft-to-boost-nasas-swift\/\" target=\"_blank\" rel=\"noopener noreferrer\">Primary source: NASA July 28 commissioning update<\/a><\/p>\n<p><a href=\"https:\/\/www.nasa.gov\/news-release\/nasa-awards-company-to-attempt-swift-spacecraft-orbit-boost\/\" target=\"_blank\" rel=\"noopener noreferrer\">Primary source: NASA Swift orbit-boost contract announcement<\/a><\/p>\n<p><a href=\"https:\/\/science.nasa.gov\/blogs\/swift\/2026\/02\/11\/nasas-swift-mission-transitions-ops-to-prep-for-orbit-boost\/\" target=\"_blank\" rel=\"noopener noreferrer\">Primary source: NASA Swift science-operations transition<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>LINK, built to lift NASA\u2019s falling Swift telescope, is tumbling after attitude-control failures, but the mission remains active.<\/p>\n","protected":false},"featured_media":0,"template":"","meta":[],"class_list":["post-981","briefing","type-briefing","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/onepress.co.kr\/index.php\/wp-json\/wp\/v2\/briefing\/981","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/onepress.co.kr\/index.php\/wp-json\/wp\/v2\/briefing"}],"about":[{"href":"https:\/\/onepress.co.kr\/index.php\/wp-json\/wp\/v2\/types\/briefing"}],"wp:attachment":[{"href":"https:\/\/onepress.co.kr\/index.php\/wp-json\/wp\/v2\/media?parent=981"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}